City of Naples Switchgear Replacement
Wastewater Switchgear & MCC Replacement
For this project, we replaced switchgear that operates a 480/277V, 3PH, 4-wire in a double-ended Main-Tie-Main/Gen arrangement, with each end powered from the same 1500kva utility transformer. Replaced two MCCs that provide power for wastewater pumps, wastewater processing equipment, and onsite pump station. This project was completed on time.
Project Type
Client
City of Naples
Location
Naples, Florida
Project Cost
$1.2M
Completion Date
November 2019