City of Pembroke Pines - City Hall Generator Replacement
City of Pembroke Pines – City Hall Generator Replacement
Installed 3 Generac 500kw industrial bi-fuel (diesel/natural gas) generators at the City Hall Building so it could be used as an EOC facility when required. The project included extensive trenching and slab modifications to connect everything inside the existing mechanical room. The facility was fully occupied and operational during the entire project.
Project Type
Client
City of Pembroke Pines
Location
Pembroke Pines, Florida
Project Cost
$1.1M
Completion Date
July 2021
Duration
160 Days