Industrial
CRU
CRU Orlando Campus Crusade – 500kw Generator Replacement
The CRU Orlando – Campus Crusade 500kW Generator Replacement project involved removing and disposing of the existing 500kW generator and installing a new customer-supplied 500kW 277/480V 3PH diesel generator on the existing concrete pad. Additionally, Eau Gallie Electric installed a new customer-supplied 800A generator distribution panel inside the new generator enclosure. Existing circuits for the generator block heater and battery charger were reused, and fuel lines were reconnected to the existing day tank, along with the reconnection of fuel pump controls. The scope of work also included obtaining permits, conducting final inspections, and providing crane and rigging services.
The CRU Orlando – Campus Crusade 500kW Generator Replacement Project holds significant importance for CRU Orlando as it ensures uninterrupted power supply, crucial for their operations. This upgrade not only enhances reliability but also reflects CRU Orlando’s commitment to sustainability and readiness for any unforeseen power-related challenges, further strengthening their ability to serve college campuses and communities effectively.