City Of Naples Wastewater Switchgear Mcc Replacement Eau Gallie Electric

Government

City of Naples Switchgear Replacement

Wastewater Switchgear & MCC Replacement

For this project, we replaced switchgear that operates a 480/277V, 3PH, 4-wire in a double-ended Main-Tie-Main/Gen arrangement, with each end powered from the same 1500kva utility transformer. Replaced two MCCs that provide power for wastewater pumps, wastewater processing equipment, and onsite pump station. This project was completed on time.

Client

City of Naples

Location

Naples, Florida

Project Cost

$1.2M

Completion Date

November 2019

Have an Upcoming Project?

Let our team of experienced industry experts work with you to deliver your project on time and on budget.