City of Naples 2023- WWTP - Generator Replacement & Electrical Improvements by Eau Gallie Electric

Industrial

City of Naples

Generator Replacement & Electrical Improvements

The City of Naples WWTP Generator Installations & Electrical project involved a comprehensive upgrade to critical infrastructure. This included the demolition of two existing generators and the installation of four 600kW generators, along with ductbank systems for power distribution. The project also encompassed meticulous installation of conduit, wiring, and connections for motors, controllers, and electrical devices. The new elevated generator pad required 200 yards of concrete for construction and features a complete rail and stair system.

Additionally, the project involved establishing grounding and surge suppression systems, as well as instrumentation and control wiring. The existing generator room was converted into a second electrical room, which included a new roof and significant electrical upgrades. The project was completed on time and within budget.

Client

City of Naples

Location

Naples, Florida

Project Cost

$1.6M

Completion Date

January 2024

Duration

150 Days