Industrial

City of Pembroke Pines - City Hall Generator Replacement

City of Pembroke Pines – City Hall Generator Replacement

Installed 3 Generac 500kw industrial bi-fuel (diesel/natural gas) generators at the City Hall Building so it could be used as an EOC facility when required. The project included extensive trenching and slab modifications to connect everything inside the existing mechanical room. The facility was fully occupied and operational during the entire project.

Client

City of Pembroke Pines

Location

Pembroke Pines, Florida

Project Cost

$1.1M

Completion Date

July 2021

Duration

160 Days