Draper – SEGT Facility Ground Up Electrical Construction

Commercial

Draper

DRAPER – Ground-Up Commercial Electrical Construction

The Titusville facility project included a complete electrical package for a new 51,204-square-foot, two-level facility. The scope included power distribution, lighting and controls, a 400 kW generator and automatic transfer switch, underground infrastructure, and grounding. Communications, fire alarm, access control, camera systems, and lightning protection supported the facility’s operational needs.

Client

RUSH

Location

Titusville, FL

Project Cost

$5.2M

Completion Date

In Progress

Duration

566 Days