FKAA – Upper Keys Electrical Equipment Upgrades
Industrial
FKAA
Florida Keys Aquatic Authority (FKAA) – Upper Keys Electrical Equipment Upgrades
The FKAA J. R. Dean Water Treatment Plant and Long Key Pump Station Electrical Upgrades project included installation of variable frequency drives, switchgear, motor control centers, switchboards, and associated power distribution equipment. The scope also included lightning protection, grounding, and control and instrumentation connections to support reliable operation at both water utility facilities.

Project Type
Client
FKAA
Location
Florida City, FL
Project Cost
$4.06M
Completion Date
In Progress
Duration
365 Days