Orlando International Airport (MCO)
Upgrade MCO ATC Tower Critical Power Distribution System
Upgrade MCO ATC Tower Critical Power Distribution System – Remove EG Generator, Install New Generator, upgrade panels and gear, set/connect/and power mobile power unit, install new ducts inside facility up 14th floor, and install new ducts inside facility up to 14th floor, including 300’ vertical duct installation inside the Air Traffic Control Towers’ Electrical Shaft.
Project Type
Location
Orlando, FL
Project Cost
$1.6M