St. Pete-Clearwater International Airport (PIE)

Airfield Electrical Vaults

Build new airfield electrical vault and demolish existing vault including EG generator, above-ground fuel tank, below ground fuel tank, precast existing vault, and new masonry vault. Upgrade ALCMS, install CCRs, relocate existing electrical vault equipment into new vault including applicable underground infrastructure. Install 12’x10’x12’ manholes to relocate homerun.

Project Type

Location

Clearwater, FL

Project Cost

$3.3M