A Master Electrician and Engineer’s Expert Guide to:
Powering the Next Generation of Advanced Air Mobility and Vertiport Infrastructure
Vertiports will demand 1-2 MW of reliable, high-quality power per pad—enough to run 700-2,000 homes.
• U.S. vertiport design remains “interim” under FAA Engineering Brief 105A; a full Advisory Circular is due in 2026.
• Megawatt-class DC fast-charging (SAE J3271/MCS) and micro-grids are emerging as the standard.
• Downwash, cybersecurity, and data-rich airfield control systems create new electrical safety imperatives.
• Eau Gallie Electric’s Airfield Systems team blends 75 years of critical-power know-how with BIM/VDC design to de-risk every step—from concept charrette to ribbon-cutting.
Why Vertiports Are Different:
Traditional heliports sip power; eVTOLs gulp it. A typical urban site serving 100 flights/day needs 40-60 MWh and peak demand above 1.5 MW—levels that force utilities, airports, and municipalities into multi-year upgrade negotiations.
Yet infrastructure guidance is still fluid. The FAA’s Engineering Brief 105A (Dec 2024) is “supplemental” to heliport AC 150/5390-2D and will evolve into its own Advisory Circular. faa.govtheaircurrent.com
Pain Points Airport Planners Face:
Pain Point | Why It Matters | Typical Oversight Risk |
---|---|---|
Grid Capacity & Upgrade Lead-Times | 1–2 MW/stand × multiple stands can exceed local feeders. | Missing the 24- to 36-month utility-approval window. |
Fast-Charging Standards in Flux | SAE J3271 “Megawatt Charging System” is still finalizing connector geometry & cooling. (sae.org) | Installing undersized or proprietary chargers that become stranded assets. |
Power Quality & Redundancy | Battery packs require tight voltage/current windows; momentary sags trip BMS. | Relying on conventional ATS/generator schemes without harmonic filtration or dynamic voltage-restoration. |
Downwash / Outwash Mitigation | Rotor wash can scatter FOD into high-voltage gear or rooftop PV arrays. (airporttech.tc.faa.gov) | Placing switchgear too close to TLOF/FATO, leading to accelerated corrosion & conductive debris risks. |
Evolving Geometry & Markings | Touch-down zones, obstacle-free volumes, and signage will change as aircraft footprints grow. (nbaa.org) | Civil works re-do’s, fixture relocation, and costly night closures. |
Cyber-Secure Control & Billing | ISO 15118-20 “Plug & Charge” and V2G settlement require encrypted comms. (theverge.com) | Exposing critical lighting & charger networks to ransomware or revenue leakage. |
How Eau Gallie Electric Airfield Systems Solves Them:
-
Design-Assist & BIM Integration
-
We model vertiport pads, conduit raceways, and charging cabinets in a clash-free 3-D BIM environment, then run load-flow and harmonic studies to size feeders, CCRs, and UPS clusters before concrete is poured.
-
-
Megawatt-Class Power Architecture
-
Medium-voltage service with pad-mounted transformers, MCS-ready DC chargers, and on-site solar + BESS micro-grids keep aircraft turnaround <15 min—even during grid curtailments.
-
-
Resilient Redundancy
-
Parallel-rated diesel-gen or gas-turbine sets with fast-ramping inverters meet FAA critical-facility rules; our in-house generator division handles install, load-banking, and remote monitoring.
-
-
Smart Lighting & Obstruction Control
-
LED FATO perimeter bars, elevated OB lights, and stop-bars tie into ALCMS or Pilot-Activated systems the moment standards finalize—no re-trenching required.
-
-
Cyber-Secure OT Networks
-
Segmented fiber backbone, IEC 62443-compliant firewalls, and ISO 15118-ready PKI gateways protect both flight ops and revenue metering.
-
-
Regulatory & Utility Liaison
-
From FAA Form 7460-1 filings to utility interconnection applications, we manage the paperwork, accelerating approvals and unlocking federal AAM grant funding.
-
Emerging Tech You Should Track:
Trend | EGE R&D Focus |
---|---|
Liquid-Cooled Megawatt Chargers | Field pilots on 1 MW / 1,250 V cabinets to validate ≤20 °C connector temps. |
DC Micro-Grids with V2G | Bidirectional converters for peak-shaving and islanded ops. |
Dynamic Stand Allocation Systems | Integrating charger status, SOC, and flight queue into ALCMS dashboards. |
Modular, Pre-Cast Power Vaults | 40 % faster install and easier future expansion. |
Digital-Twin Predictive Maintenance | Sensor fusion (thermal, vibration, PQ) feeding AI models to cut unscheduled downtime by 30 %. |
Helpful Resources:
-
FAA Engineering Brief 105A – Vertiport Design (faa.gov) faa.gov
-
NREL “Electric Aircraft Will Need Powerful Ports” nrel.gov
-
SAE J3271 Megawatt Charging System Overview (sae.org) sae.org
-
MDPI Paper: Vertiports as the Infrastructure Backbone of AAM mdpi.com
Call 321-259-2885 Ext.107 or email aguajardo@eg-electric.com to schedule a 30-minute discovery session with our Airfield Systems team.
Eau Gallie Electric Airfield Systems—turning visionary air-mobility concepts into a safe, electrified reality.